CASE STUDY

BIOMETHANATION PLANT BASED ON ABATOIR SOLID WASTES AT ALIGARH, UTTAR PRADESH

  • Place of Installation
:Aligarh, Uttar Pradesh
  • Implementing Agency
:M/s Hind Agro Industries, Aligarh, Uttar Pradesh
  • Technology
:Low Speed Agitator tank Reactor (LSATR) Technology
  • Technology Institution for Supervision
: Central Leather Research Institute, Chennai

BACKGROUND

M/s Hind Agro Industries Ltd., (HAIL) is a 100% export oriented modern integrated abattoir - cum - meat processing plant for buffaloes and sheep meat with an installed capacity of 33510 MT of chilled and frozen meat per annum. It has been set up by M/s Hind Agro Industries Ltd.with the cooperation of three agencies of State and Central Government i.e. UP Pashudhan Udhyog Nigam Ltd.; a UP State Govt. Undertaking; the Pradeshiya Industrial and Investment Corporation of U.P. Ltd. (PICUP), a UP State Financial Institution; and Food Processing Department, Government of India. The plant has been established with the technical know - how and collaboration of Fletcher Projects of Newzeland and Seanet of Australia and commercial production was commended from June 1997. The present operating capacity of the plant is Buffalo - 800 nos. per day and Sheep 100 nos. per day. The estimated waste generation at present is about 50 tonnes per day consisting of (i) Animal Droppings (ii) Rumen (iii) Fat and Grease and (iv) Fodder Residues and Hay.

The Sources, Waste Quantity and the Characteristics of the wastes are as below;

Waste Quantity: About 50 tonnes per day as per composition mentioned below:

Description
Value (tonnes/ day)
Buffalo
Sheep
Droppings
2.75
2.0
Rumen & Other (paunch)
16.50
6.0
Fat(from grease trap)
1.10
1.0
Agro Wastes
1.65
1.0
Other Wastes
11.00
9.0
Total
33.00
19.0

Waste Characteristics are:

DescriptionCharacteristics
Moisture Content (%)
Dry Solids
(%)
Volatile Solids (%)
Droppings
81.0
19.0
78.6
Rumen & Other (paunch)
87.0
13.0
87.3
Fat(from grease trap)
52.2
47.8
98.6
Agro Wastes
60.0
40.0
68.0
Other Wastes
65.0
35.0
91.0

MATERIAL BALANCE

Material balance calculation of the plant for a feed of 52 tonnes / day of raw waste is as under:

  • Raw Feed
:52 tonnes / day
  • Make up water available from effluent treatment plant
: 28 m3 / day
  • Volatile Solids Loading Rate
: 12 tonnes / day
  • Digester Retention Time
:36 Days
  • Efficiency of Digesters
:50%
  • Volatile Solids Destroyed
:5.66 tonnes / day
  • Biogas Produced
:5200 m3 / day
  • Biofertilizer Production
    (25 % solids)
:20 tonnes / day

ENERGY BALANCE

Energy balance calculation of the plant is as under:

  • Auxiliary power requirement
:300 kWh / day
  • Electrical energy generation from the plant
:10500 kWh / day

At present, biogas is being utilized as fuel in the boiler to generated steam.

MANPOWER REQUIREMENT FOR PLANT

  • Engineers [Electrical/ Mechanical]
:3
  • Chemist
:1
  • Supporting Staff
:1

COST ECONOMICS

Total cost of the project is Rs.325.00 lakh + USD 6.56,000. 50% of this has been borne by M/s HAIL and the rest by NBB/MNES.

BENEFITS ACHIEVED

  • Fuel Savings/ Revenue Earned: The plant is expected to save electrical energy consumption of the factory
  • Waste Management/ Cleanliness: The project is expected to demonstrate an eco - friendly solid waste management technology for abattoir industry with a view to minimize green house gas emissions and odour nuisance significantly.